M7-06 Functional/Technical Design Document (D2d)¶
Milestone: M7 — Reclaim Protocol SOW Reference: Deliverable D2d Requirement Clarity: ⚠️ Depends on M7-01 scope sign-off first Dev Status: ❌ Not started as a formal deliverable — substantial design exists in M7-02/M7-02b/M7-05 but needs consolidating into the Appendix 2 D2d format once scope is confirmed
Overview¶
Produce the Functional/Technical Design deliverable for M7's scope (Reclaim Protocol), for Curo's review and approval.
Tasks¶
- Wait for M7-01 scope confirmation
- Consolidate the existing HMRC integration design, architecture diagrams, and candidate consent flow design into a single design pack
- Submit to Curo for review
Dependencies¶
- M7-01 scope confirmation — blocking.
Acceptance Criteria¶
- Design materially supports agreed requirements and integrations (per SOW Appendix 3, D2d)
Existing Reference Material¶
- M7-02-hmrc-integration-technical-design.md, M7-02b-updated-architecture-diagram.md, M7-05-candidate-consent-flow.md
Blockers & Risks¶
Same blocking dependency as the rest of M7.